Pipe line Berm Stabilisation with TF-2000.
TF-5000 polymer used for Road building. No importing of materials is allowed at site, Soils must be used in place.
Weekly updates that show how effective TF-2000 is at slowing the effects of blown sand. After 4 weeks the access road is clear of sand.
TF-5000 infused application for pathways.